Build options, time and complexity, tools, site readiness and the support available to you.
Some owners assemble their Growing Domes themselves or with neighbours and friends, others hire contractors or greenhouse builders, and some work with experienced installers. Assembly begins once your site preparation and foundation are complete. While hands-on, the process is supported through step-by-step instructions, video guides, and access to Arctic Acres' online build portal.
Your Build Options
How to build a geodesic dome greenhouse. There are three primary ways to complete your Growing Dome installation:
DIY (do-it-yourself)
Best suited for hands-on owners with basic construction confidence, or for smaller Growing Dome sizes.
Lower overall cost
Greater personal involvement
Requires time, tools, and coordination
Most first-time DIY builds are successfully completed with the help of friends, family, or a small crew. Assembly involves moderate physical labour, including lifting, positioning panels, and working at height for larger domes.
Hire a Contractor
Best suited for buyers who want to reduce coordination risk or prefer a more hands-off approach.
Higher cost
Less direct involvement
Requires selecting and managing a contractor
Arctic Acres can support your contractor during the build process by providing access to documentation and answering technical questions.
Work with Our Builders Network
Best suited for buyers looking for guidance toward builders familiar with the system, or multi-unit installations.
Moderate to higher cost
Reduced learning curve
Access to experienced installers (based on area and availability)
If you or someone you know is interested in working with Arctic Acres as a builder or installer, we welcome inquiries. Contact us to learn more about upcoming opportunities and our developing builder program.
Time & Complexity
Build time depends on dome size, crew, and preparation. A prepared foundation and organized materials significantly reduce build time.
Assembly timelines vary depending on dome size, crew size, and site readiness.
Up to 26 ft domes: approximately 4–7 days
33 ft and 42 ft domes: approximately 7–10 days
As a reference, a 15 ft dome can typically be assembled in approximately 35 hours with a 3-person crew on a prepared foundation.
Larger domes involve increased height, additional components, and more coordination. These builds often benefit from additional labour, experience, and equipment such as scaffolding.
Tools & Equipment
Most Growing Dome builds use standard construction tools, including:
Drills and basic hand tools
Ladders or elevated access equipment
Safety gear (gloves, boots, eye protection)
Larger builds or more complex sites may require additional equipment such as scaffolding or machinery for site preparation.
Site Readiness
Preparing the site in advance is one of the most important factors in a smooth installation.
Foundations should ideally be completed prior to delivery
The build area should be cleared, level, and accessible
Ensure sufficient space for staging materials and moving around the structure
If using equipment during construction, consider access points carefully. Larger tools or machinery must be able to enter and exit the build area without obstruction.
Build Conditions
Assembly is best completed in stable, dry weather conditions.
Aim for temperatures above 12°C (54°F)
Cold conditions can make panels, hardware, and sealing materials more difficult to work with
Wet or damp conditions can slow progress and affect installation quality
The final seam taping step requires dry conditions and temperatures above 12°C to ensure proper adhesion
Planning your geodesic dome greenhouse build window in advance will help ensure a smoother process.
Support & Resources
Arctic Acres provides ongoing support throughout the greenhouse delivery and build process.
Access to a detailed online build portal with step-by-step instructions and videos
Support for customers and contractors during installation
Guidance to help resolve questions or challenges as they arise
If you are working with a contractor, they can be given access to the same resources once verified.